MTA Bus Time

TIP: Enter an intersection, bus route or bus stop code.Do not cross in front of the bus. Let the bus leave first. Always cross at the corner.

Bus Stop:

HYLAN BLVD/CLOVE RD

Buses en-route:

S53  PORT RICHMOND

  1. 19 minutes,4.6 miles away (at terminal, scheduled to depart at 3:26 PM) Vehicle 7089
  1. 41 minutes,5.2 miles away (+ layover, scheduled to depart terminal at 3:36 PM) Vehicle 7055

S78  BRICKTOWN MALL via HYLAN

  1. 15 minutes,2.8 miles away Vehicle 8173
  1. 43 minutes,5.0 miles away (+ layover, scheduled to depart terminal at 3:30 PM) Vehicle 8147

S79-SBS  SELECT BUS SI MALL via HYLAN

  1. 11 minutes,3.9 miles away Vehicle 8612
  1. 20 minutes,4.5 miles away (at terminal, scheduled to depart at 3:20 PM) Vehicle 8600
  1. 29 minutes,4.5 miles away (at terminal, scheduled to depart at 3:28 PM) Vehicle 8919

SIM1  ELTNGVLLE TRANS CTR via HYLAN via RICH

  1. 20 minutes,10.1 miles away Vehicle 2440
  1. 26 minutes,11.7 miles away Vehicle 2422
  1. 34 minutes,12.4 miles away, ~4 passengers on vehicle Vehicle 2563

SIM1C  ELTNGVLLE TRANS CTR via HYLAN via RICH

  1. 7 minutes,2.5 miles away, ~48 passengers on vehicle Vehicle 2759

SIM7  ELTVLLE TRANS CTR via HYLAN via RICHMOND

  1. 29 minutes,12.2 miles away, ~13 passengers on vehicle Vehicle 2411

SIM10  ELTINGVILLE TRANS CTR via HYLAN via RICH

  1. 7 minutes,2.4 miles away Vehicle 2757
  1. 18 minutes,9.1 miles away, ~10 passengers on vehicle Vehicle 2624
  1. 31 minutes,15.2 miles away, ~27 passengers on vehicle Vehicle 2742

SIM11  NEW DORP via HYLAN BL

  1. 57 minutes,17.4 miles away, ~13 passengers on vehicle Vehicle 2616
  1. 61 minutes,17.5 miles away Vehicle 2652
  1. 53.5 miles away Vehicle 2652

Service Alert:

  • The 2:55pm S53 to 4 AV/86 ST is canceled
  • The 2:52pm S79+ to 4 AV/86 ST is canceled
  • The 1:35pm S78 to SAINT GEORGE FERRY/RAMP C is canceled
  • St. George Ferry-bound S78 buses are bypassing the stop on Arthur Kill Rd at Richmond Valley Rd
    For service, please use the stops on Arthur Kill Rd at Nassau Pl or South Bridge St instead.

    What's happening?
    Construction
  • The 2:37pm S78 to SAINT GEORGE FERRY/RAMP C is canceled
  • The 2:56pm S53 to PORT RICHMOND AV/RICHMOND TERR is canceled
Refresh (Updated 3:14:18 PM)